Civic Issues
Topics getting the most attention in Huber Heights public meetings, ranked by how frequently they are discussed.
6 issues in water utilities with high priority
Stormwater, creek alignment and sewer capacity concerns
Residents dispute the mapped path of Middle Branch Henry Creek, report recurring sewage backups from the Costner pump station, and fear new impervious surfaces will worsen flooding. Staff said detailed surveys come only at the detailed development plan stage.
Water Billing Software Transition
The utility billing system is switching over and offices are closed November 4-13. If you use AutoPay, you must re-enroll with your new account number — but no late fees or shutoffs through January 2.
Sewer lift station capacity in Carriage Trails
A resident warned the existing Carriage Trails lift station may be near capacity with apartments and hundreds of new homes coming. Staff explained the next lift station is designed, developer-funded (~$1 million), and timed to come online in late 2028/early 2029, with connections capped at 300 homes until then.
Tri-Cities $223.8 Million Plant Overhaul
Main breaks are down this year (29 vs. 39 last year), but hard water deposits from the new membrane setup may be causing some breaks — expected to be temporary.
Water bill relief fund
The city is rewriting its water leak adjustment policy, which decides who gets a credit on a big bill after a leak. The board wants to know if the change will also cover sewer adjustments, and the new policy will be posted on the city website once finished.
2026 Sewer and Water Infrastructure Projects
Council greenlit three utility projects: rehabilitating sewer lines, replacing filter media at the Rip Rap Road water plant, and building a new Brandt Pike lift station that combines two aging ones. These keep water and sewer service reliable as the city grows.