John Workley
No biography on file yet.
At a glance
- News mentions
- 0
Voice
- Meetings spoken in
- 2
- Total speaking time
- 1:17
- Avg per meeting
- 0:39
- Segments
- 26
Want every word Workley has said?
The OpenCity MCP for Claude.ai answers questions like “what has Workley said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Voting record (33)
Oldest to newest — hover a bar for the item.
88 N. Main Street door replacement (AHBR 26-1252)
39 Essex Circle golf simulator and storage addition (AHBR 26-1281)
Believes extending the forward-projecting wing further violates the design standards.
Denial of three-story massing waiver for 586 Owen Brown Street townhomes (App. 2026-94)
Believes the proposal meets the five design principles and is a good compromise
approve the application with the following conditions: staff approval of the corner boards; a satin or flat fabric finish for the awnings; approval of the columns' size and material; and a subdued col
that this AHBR Application be approved as amended with the dormer lowered by approximately three to four inches and replace the boral panel on the left side elevation with Hardi-Board .
approve the application with the following conditions: that a setback exception be granted due to the unique shape of the lot, that grids be added to the window on the right side elevation, that the r
that this AHBR Application be approved as submitted and detailed in the meeting
approve the Consent Agenda
that the July 8, 2026, Minutes be approved
that the meeting be adjourned at 9:13 p.m.
that the AHBR concludes the structure in question does not possess historic or architectural significance . Furthermore, the Board finds that the application for a demolition permit will not result in
to conduct a site visit
to approve the application as submitted, noting that the existing garage is already forward of the main mass of the house and that, while the proposal expands this condition, the practical difficultie
to approve the application with the condition that two separated or two together transom windows be on the back of the structure
that the Consent Agenda be approved
to continue the application
that a site visit take place to access the condition of the house
to approve the application for demolition based on the following reasons: The request meets LDC Section 11 .1(c)(2); the unique conditions of the property make continued preservation difficult; the ho
to approve with modifying the awning windows to six or eight panel and staff reviewing the revised elevations for compliance
to approve the application as revised
to continue the application
that the application be approved
Move items B, C, and E to end of agenda
Approve Consent Agenda (incl. 229 N Hayden Pkwy three-season room)
Deny ground sign at 7542 Darrow Rd (AHBR 25-137)
The gloss finish and lack of trim violate Architectural Design Standard V-5; AHBR does not grant exceptions for practical difficulty.