Civic Issues
Topics getting the most attention in Lima public meetings, ranked by how frequently they are discussed.
11 issues in roads
Traffic light at Main and Grand
A resident wants the no-turn-on-red restriction lifted when the charter school isn't in session; the city engineer is reportedly receptive.
2026 Combined Sidewalk Project
The city would sell $25,000 in short-term notes to front the property owners' share of sidewalk construction costs, recovering the money later through special assessments on those properties.
Sidewalk repair assessment prioritization
A resident detailed confusing rules, inconsistent inspection practices, and rejected repair methods; Councilor Lowe voted against sidewalk financing until the city fixes its own sidewalks first.
Free meter parking for handicapped placard holders
Councilor Gordon referred the question of free parking meter use for handicapped sticker holders to the safety-services committee.
Denied road-hazard damage claim
A resident whose tire and rim were damaged by a street hazard urged the city to do more for drivers who report hazards, since current rules penalize the first reporter.
Regional transportation funding
About $2M a year in federal/state transportation funds is available regionally; projects need engineering readiness and a 20% local match.
Street pavement preservation program
The preliminary 2027 paving list is out for council review — comments are due by July 17, with a final list expected at the July 27 meeting for submission to the state.
Street Resurfacing Project 4-26
The Mayor is seeking authorization to contract with the Shelly Company, likely for public works or paving-related work. Contract terms and dollar amounts are not available.
Street Crack Sealing Program
A $1.28 million Shelly Company contract will resurface about 6.2 miles of streets this summer, plus a $52,755 crack-sealing contract with Scodeller Construction to stretch pavement life.
Train blocking crossings on Central Street
Councilor Lowe says residents keep calling about a train that stops on Central Street tracks — sometimes for nearly three hours — and sounds its horn at 3 a.m. The city can't control how the railroad warns at crossings, but residents can report blocked crossings to police while Lowe pursues a time study.
Bus stop upgrades across Lima
A $189,944 project will build boarding and alighting zones at bus stops citywide, paid for by the Allen County RTA.