AF

Alexandria French

Vice Mayor2021-11-01–2029-11-01 (month-level start: November 2021 first elected November 2, 2021 and seated at the November 2021 organizational meeting per Journal-News; sworn in again for the 2025 term November 24, 2025 per organizational meeting minutes; month-level end: November 2029, four-year term of the 2025 four-seat cycle per cityofoxford.org staggered 3 and 4 seat council description, the city council page lists November 2027 for all members which does not match that cycle)

No biography on file yet.

At a glance

News mentions
0

Term ending Nov 1, 2029.

Voice

Meetings spoken in
16
Total speaking time
46:25
Avg per meeting
2:54
Segments
737

Want every word French has said?

The OpenCity MCP for Claude.ai answers questions like “what has French said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (12)(Roads)

high↑Jan 2026[26]

Safe Streets For All Safety Action Plan

The plan comes with cost estimates for many projects, setting up future grant applications.

medium↑Nov 2026[13]

Spring Street and Lynn Avenue Restriping

Restriping costs absorbed within the 2027 repaving budget; not specified.

high↑Nov 2026[10]

Bicycle and Pedestrian Master Plan

The plan includes planning-level cost estimates to guide future city capital spending and grant applications, though no specific dollar figure was approved at this meeting.

high↓Jan 2026[9]

Sidewalk, Curb, and Gutter Improvements

Cost estimates for the four corridors come back to Council in April; the study is funded through a federal transit partnership with BCRTA.

high↓Jan 2026[6]

Stormwater runoff and grading on Hester Road

Heavy earthwork and the detention basin are driven by the need to connect sanitary sewer by gravity flow from a shallow Hester Road connection point.

high↓Apr 2026[6]

2026 Street Resurfacing Program

Up to $700,000 from the city's paving budget.

high↓Sep 2026[5]

OPWC Issue One funding for roadway improvements

About $800,000 total, with the city's share roughly $248,000 if the 69% grant comes through.

medium↓Apr 2026[1]

US27 Resurfacing Grant Application

Grant-funded if awarded; no local cost was specified.

medium↓Apr 2026[1]

Complete Streets Policy Update

Small contract expansion for KZF now; actual sidewalk construction funding is a future decision.

high↓Jan 2026[1]

New sidewalk on Olde Farm Road

About $153,000 total — potentially ~$76,500 city share and roughly $15,300 average per property owner without it.

high↓Feb 2026[1]

Proposed Heritage Subdivision Sidewalk ($153,000)

$153,000 estimated, with homeowners paying 25% (about $4,250 each).

low↓Mar 2026[1]

U.S. Route 27 right-of-way dedication

Shifts some snow removal costs onto abutting property owners.

Decisions during term (0)

Recorded while French was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Roads.

Voting record (0)(Roads)

No votes found matching Roads.