32 issues with medium priority
Bailey Farm Subdivision Phase 3
A first reading of an emergency ordinance approving the record plan for 21 new single-family lots on about 5.1 acres in the Bailey Farm development. Planning Commission already approved the plan September 9; council action comes later.
East Street first-time homebuyer rezoning
City land is being used for an easement so three homes under construction on East Street can connect to electric power.
Downtown parking expansion via Smartstart settlement
Council settled a land acquisition lawsuit, picking up 50-plus more parking spaces near the train station. More parking should help downtown visitors and businesses.
Vietnam Veterans Memorial unveiling
A privately funded memorial by local resident and business owner Daklak Do will be built at Gardner Park next to the existing veterans and Purple Heart memorials, with completion targeted for Veterans Day 2026.
Adaptive reuse of historic Jonathan Wright House
The city signed a formal agreement letting the Historical Society keep running the Null Log Home — mostly an insurance formality, but it secures the historic site's continued public operation.
Easton Farm PUD-MU elementary school site plan revision
A major revision to the approved general plan for the Easton Farm mixed-use development, involving the elementary school site, was scheduled for preliminary review. The change could affect how that portion of the development is built out.
Income tax filing age raised to 23 (proposed)
The adopted ordinance raises the tax filing age from 18 to 23 and adds late-payment penalties and interest, matching neighboring cities that use the Ohio Attorney General for collections.
CareFlight helicopter funding request from Atrium Medical Center
Atrium Medical Center is asking Springboro to chip in for a new CareFlight helicopter based at Warren County Airport that would serve area first responders. The pitch comes to the August 6 work session.
Clearview Crossing PUD-R plan amendment
A minor change to the approved general plan for the Clearview Crossing residential development was scheduled for final approval. It covers new home plans in the planned unit development.
Clear Creek Park land donation
The Bailey Farm developer is giving the city about 14 acres on Red Lion-Five Points Road, which will stay in its natural state as a passive park — free green space for the community.
$4 Million Land Acquisition Bond Note Renewal
Council rolled over the $4 million bond anticipation note from 2025, which matures September 25, keeping the city's land acquisition financing in place.
Municipal building chiller replacement
The original 2009 chiller at City Hall is failing, so Council awarded the replacement to Driekast Piping for $359,689 — about $110,000 under the engineer's estimate.
Ascent Subdivision Section Six and Lytle Five Points Road dedication
Council finalized the record plan for Ascent Subdivision Section Six (10.2 acres on West Tech Road) and dedicated right-of-way on Lytle Five Points Road — both already cleared by the Planning Commission.
The Ascent, Section Six record plan
The Ascent subdivision's sixth section was up for final record plan approval, a step that locks in the layout for this phase of homes. Final plat approval is one of the last hurdles before lots can be recorded and built on.
New Beginnings First-Time Homebuyer Program
The city built three homes on East Street and will sell them to first-time buyers through a random drawing run by County Auditor Matt Nolan. Applications open around Labor Day and run through mid-December; closings could start as early as spring 2027.
Clearcreek Reserve West, Section 2 subdivision
A record plan for eight single-family lots on 28.8 acres along Red Lion-Five Points Road got its first council reading; Planning Commission already approved it May 13.
Eastbrook Farm Phase 2 mixed-use development
A second mixed-use development, Eastbrook Farm Phase 2, is proposed for the northeast corner of the same intersection, also asking for Office-to-PUD-Mixed Use rezoning. It was up for preliminary review only — an early chance for commissioners and residents to weigh in before final decisions.
2026 Street Resurfacing Program
Curb and gutter replacement is underway ahead of street paving, and the Service Department has started cutting grass in parks and public areas.
Community Park to West Factory Road shared use path
Council hired a firm to design a 3,200-foot trail from Community Park through the DK Bike Park, crossing Twin Creek to Factory Road. Construction is expected around 2029, adding a safe walking and biking connection.
Warren County Tactical Response Unit MOU renewal
Springboro has been part of a multi-agency tactical response (SWAT-style) team for over 20 years. Council renewed the Memorandum of Understanding that keeps the city in the unit, which handles high-risk, high-violence incidents.
Storm Flooding Impacts
Recent storms flooded parts of the city, including Heatherwoode Golf Course, and closed Lower Springboro Road for six to seven hours. Crews have cleaned up both and the road is back open.
Yankee Road Roundabout Design
The city hired American Structurepoint for $227,904 to design a roundabout, pedestrian crossing, and added lighting at Yankee Road, Springs Boulevard, and Spring Mill — a busy intersection getting a safety upgrade.
2026 Supplemental Appropriation of $513,000
The city added $513,000 to its 2026 budget via an emergency ordinance, skipping the usual extra readings because the money was needed right away. Funds were available to cover it — this is budget housekeeping, not a tax increase.
Easton Farm development update
Construction has started at Easton Farm, and the school district is preparing a 20-acre parcel for a new elementary school. Once the replat is done, the city-schools Jonathan Wright land swap can proceed by the end of April.
South Richards Run Road general plan
Alongside the rezoning, the commission was to take a preliminary look at the general plan governing development of the same South Richards Run Road site.
Northampton Phase 3 residential subdivision
The commission was set to consider final approval of the final development plan for Northampton Phase 3, a residential PUD at 1405 South Main Street. Final approval would move the subdivision forward toward construction.
West Central Avenue mixed-use general plan
A companion general plan review for the proposed mixed-use development at West Central Avenue and Clearcreek-Franklin Road.
West Central Avenue and Clearcreek-Franklin Road mixed-use rezoning
An office-zoned corner at West Central Avenue and Clearcreek-Franklin Road was under preliminary review to become a mixed-use development, potentially adding retail, dining, and housing at the intersection.
Traffic signal radar detection upgrades
The last intersections in town get radar detection, finishing a system upgrade that started with a $400,000 state safety grant — and radar works better than old scope sensors in snow.
South Richards Run Road industrial rezoning hearing
A public hearing on February 5 will take up rezoning about 12.123 acres on South Richards Run Road to heavy manufacturing (M-2) from three different districts.
Central Greenway trail extension
The next segment of the Central Greenway bike trail will run from E. Milo Beck Park along Factory Road to the city limits, with ODOT covering 80 percent of the cost.
West Tech Road Extension and Advanced Engineering expansion
Springboro is spending $687,499 — under estimate by about $143,000 — to extend West Tech Road so Advanced Engineering can build its third building, bringing roughly 60 jobs.