Civic Issues

Topics getting the most attention in Stow public meetings, ranked by how frequently they are discussed.

Filtered to Water Utilities
Filtered to High

12 issues in water utilities with high priority

HighWater Utilities

Water rate increase (Ordinance 2026-137)

Water rate legislation with multiple options comes September 10, including the Raftelis study a previous council rejected. A water meter replacement project in 2027 will require new debt, making a rate decision likely.

6 mentions (1 this month)Last discussed Oct 22, 2026
HighWater Utilities

Summit County Pump Station No. 19 replacement (Wyoga Lake)

A 61-year-old sewer pump station near Wyoga Lake failed in 2023 and has been limping along on salvaged parts while the county's replacement project has dragged since 2015. Residents fear a second failure could send sewage into homes, the lake, and downstream into the Cuyahoga River. The county now says construction could start in mid-2027.

2 mentionsLast discussed Sep 24, 2026
HighWater Utilities

Water meter replacement and OPWC funding

Council authorized applying for state infrastructure funding toward replacing outdated water meters, a project estimated up to $4.1 million through sole-source vendor Core & Main.

2 mentionsLast discussed Sep 24, 2026
HighWater Utilities

Water Rate Increases and System Investment

Stow's water funds are running deficits and the system needs roughly $35 million in upgrades — new meters, a second water tower, and replacement of 1956-era lines. Every option on the table raises bills over the next four years; the question is how much and how fast. Council Member Coffey wants a cheaper two-year plan before committing.

2 mentionsLast discussed Sep 10, 2026
HighWater Utilities

Stormwater detention study

The city wants to know if two parcels it owns — on Hibbard Drive and Maplewood — can be turned into detention basins to reduce downstream flooding. E.L. Robinson Engineering would study it for up to $56,472 from the storm water fund.

2 mentionsLast discussed Aug 6, 2026
HighWater Utilities

THM removal system contract at City Center water tower

The city is paying for year five of a ten-year system that strips trihalomethanes — a carcinogenic chlorine byproduct — out of drinking water at the City Center water tower. The EPA requires removal and fines non-compliance, so this keeps Stow's water safe and legal.

2 mentionsLast discussed May 14, 2026
HighWater Utilities

Homewood and Echo Road Storm Improvements

Bidding starts on storm improvements for Homewood and the first Echo Road phase, but three of the four Echo Road phases are stuck until neighboring Munroe Falls completes downstream channel work.

2 mentionsLast discussed Feb 26, 2026
HighWater Utilities

Water Department GIS and Leak Detection Tools

After roughly 90 water main breaks last year, the water department gets a correlator that pinpoints hidden leaks between valves, saving thousands in contractor call-outs and lost water.

4 mentionsLast discussed Feb 26, 2026
HighWater Utilities

Rising emergency waterline repair costs

The city has had 17 water main breaks this year and spent about $500,000 on repairs last year, with roughly $14 million in 1956-era mains needing replacement. The water fund hasn't had a rate increase in 20 years, and the Raftelis study proposes phased increases — council members are clearly bracing for that debate.

2 mentionsLast discussed Feb 12, 2026
HighWater Utilities

King Drive water line replacement

A resident reported roughly 45 water line breaks on King Drive and asked if replacement is planned. The city says the project is on the list, waiting for funding.

3 mentionsLast discussed Feb 12, 2026
HighWater Utilities

Use of TIF Funds for Water Main Repairs

The city has had 17 water main breaks this year and spent about $500,000 on repairs last year, with roughly $14 million in 1956-era mains needing replacement. The water fund hasn't had a rate increase in 20 years, and the Raftelis study proposes phased increases — council members are clearly bracing for that debate.

4 mentionsLast discussed Feb 12, 2026
HighWater Utilities

Water main breaks review

Water main breaks keep climbing — twelve already this year — driving the emergency repair budget to $150,000 for M Campbell plus $25,000 for backup Fioritti. Big winter temperature swings make breaks predictable days in advance.

3 mentionsLast discussed Jan 22, 2026