Civic Issues
Topics getting the most attention in Vandalia public meetings, ranked by how frequently they are discussed.
10 issues in water utilities
Delinquent utility and service assessments
An emergency ordinance lets the city bill delinquent stormwater, trash, sewer, water, weed cutting, and property maintenance charges through the county auditor — meaning unpaid bills show up on property owners' tax bills.
Water Main Replacement Near the Pool
Aging water mains near the pool and along Randler Avenue will be replaced for about $1.5 million, with $500,000 covered by state funding.
MDNPP water main replacement project
Old water mains, hydrants and residential service lines along Marcellus, Desales, Neri, Paula and Pius would be replaced, followed by repaving. The state could cover $500,000 of the $1.6 million price tag.
Tri-Cities Wastewater Facility upgrade
A major sewer upgrade is coming with projected cost increases, and capacity fees for new homes and businesses across all three partner cities are under discussion.
Farrell Rd sewer crossing collapse
An inspection found a collapsed sewer support over Poplar Creek, forcing emergency design work for a permanent fix. The city is seeking state emergency funds to help pay for construction.
Sanitary sewer CIPP lining contract
Council awarded the 2026 sewer lining contract to United Survey Inc. at $141,562 — all three bids came in under the $209,000 estimate, with a $50,000 county block grant helping fund it.
Poplar Grove Sanitary Sewer Protection
A sewer main near Poplar Grove Drive is exposed and vulnerable because of creek erosion. Engineering design is funded now, with construction planned for 2027 — protecting the sanitary system serving nearby neighborhoods.
Municipal utility minimum charge questioned
A resident questioned why his bill is $90 a month regardless of water use. Staff explained the charge covers infrastructure, trash, and sewer, and offered a breakdown of costs.
Bristol Drive sewer replacement
A $53,000 sewer main replacement serving about 220 homes and a park restroom will be done before the Robinette Park splash pad opens this summer.
Completion of citywide smart water meter replacement
The city is finishing a swap of all 5,800 meters to ultrasonic models that read more accurately and let you track your own water use in the EyeOnWater app. Remaining installs need scheduled appointments.