Top issues during term (12)(Roads)
Downtown infrastructure project moves forward
Holiday-season disruption could mean losses equal to a large share of annual revenue for some shops.
ODOT resurfacing of State Route 94
NOACA covers 80% of construction; the city's local match and design costs are the main expense, with TIF dollars helping repay loans.
Street salt costs rising
Salt likely to cost more next winter — roughly $65+/ton vs $56.69 last season.
Sidewalk repair assessment program
Roughly $700,000 combined across the annual maintenance programs, with sidewalk assessments borne by affected property owners.
Quadral Drive reconstruction
A potential $3-4 million unfunded road reconstruction competing for the same cash reserves.
Downtown improvement project cost overrun
Roughly $29 million in principal and interest through 2046, though about $1.9M in cash reserves will reduce the debt load.
Hidden Valley neighborhood road conditions
Seville Road Access Project construction contract
Costs will be set by the bids once awarded.
2027 Annual Street Program
About $500,000 from the street improvement levy.
Downtown parking shortage
Parking fines have risen from $5 to $25, hitting downtown residents directly.
Woodlawn Cemetery paving contract
Costs will be set by the bid process; paid from the street improvement program.
2026 street improvement program and roundabout design
$500,000 for street resurfacing plus $96,000 to finish the roundabout design.