Civic Issues
Topics getting the most attention in Avon Lake public meetings, ranked by how frequently they are discussed.
5 issues in roads
Walker Road Phase 6 completion
Council approved going out for bids to pave Walker Road from Jaycox to Lear Road — a long-awaited project. Bonds of about $1.6 million plus a proposed tax increase are part of the funding puzzle.
City Infrastructure Projects Update
The Electric Boulevard bridge and Walker Road Phase 6 paving should wrap up by October 30 (railing lags to November 30), and pavement marking starts November 2.
Heider Creek culvert replacement
The bridge flagged by ODOT inspections needs replacing; American Structurepoint gets up to ~$158,727 for design work, with OPWC funding for construction.
Lake Road Sidewalk Program ODOT grants
Council accepted $2.6 million in ODOT grants for Lake Road sidewalks. Electric Boulevard at Heider Creek closes June 29 for 11 weeks for water work and a culvert replacement.
Surrey Lane Bridge load restriction
The annual inspection means a load restriction will be posted on the Surrey Lane bridge within 30 days; the city will explore ODOT bridge funding, though neither it nor Spinnaker Drive currently qualifies.