19 issues in roads

HighRoads

Oakes Road Sidewalk Project Wrap-Up

The Safe Routes to Schools sidewalk project from Barr Road to Blossom Hill is moving forward with Allega as the low bidder at $268,808.85; work could start around May and finish before school resumes.

5 mentions (1 this month)Last discussed Nov 3, 2026
HighRoads

Valor Acres traffic studies

With two to three building sites left, the city is paying TMS Engineers $7,545 to independently verify the developer's traffic study assumptions, focused on Brecksville and Miller Road impacts.

4 mentions (2 this month)Last discussed Oct 20, 2026
MediumRoads

Traffic signal warrants along Brecksville Road

An independent review confirmed no intersections near Valor Acres — or elsewhere along Brecksville Road, including Mill Road, Valley Parkway, and Parkview Drive — warrant a traffic signal, even with new development traffic. The aging Miller Road signal will be monitored and upgraded as budget allows.

1 mentionLast discussed Oct 8, 2026
HighRoads

Enbridge Utility Cuts on New Pavement

Enbridge is replacing old steel gas mains along Route 82, Wiese, Glen Valley, Calvin and Riverview down to Preston Village — a roughly four-month project affecting a couple hundred homes, with contractor appointments needed inside each house.

4 mentionsLast discussed Oct 6, 2026
MediumRoads

State Route 21 Downtown Project Wrapping Up

The latest phase of the Route 21 project is finished and, by council's report, came out well — good news for daily commuters through Brecksville.

4 mentionsLast discussed Oct 6, 2026
MediumRoads

County Road Maintenance Funding Application

The city will seek county reimbursement for paving Mill Road (west corporation limit to the Board of Education drive) and Old Whitewood Road from Route 21 to Mill Road in 2027.

1 mentionLast discussed Oct 6, 2026
HighRoads

Route 82 Sidewalk Grant Application

The city is applying for federal grant money through NOACA to build sidewalks on Chippewa Road (SR 82) from Cinnabar Drive to Riverview Road and make the Chippewa/Riverview intersection ADA-accessible. It's a funding application only — construction depends on getting the grant.

3 mentionsLast discussed Sep 15, 2026
LowRoads

Sidewalk deferral variances for new homes

The Erkers won a unanimous recommendation to hold off on building a required public sidewalk, since no sidewalks exist on that side of Highland Drive and it would 'go nowhere.'

2 mentionsLast discussed Sep 8, 2026
MediumRoads

Brecksville Road Phase 2B Completion

Council hired GPD Group to design the next phase of repaving on State Route 21 (Brecksville Road). Better pavement is coming, though construction is still downstream.

5 mentionsLast discussed Sep 1, 2026
MediumRoads

Speeding on State Route 82 near Heinen's

A Chippewa Trail resident says drivers blow through at 50–60 mph in a 25 zone. Police agreed to direct special speed enforcement to the area.

2 mentionsLast discussed Aug 18, 2026
HighRoads

Stop-sign and crosswalk safety at Sunnydale/Mill Road

Residents report cars running the three-way stop and crosswalk at Sunnydale and Mill Road, plus Mill/Hilton/Whitewood — right before school starts.

1 mentionLast discussed Aug 18, 2026
HighRoads

2026 Concrete Road Program Change Order

A big year for paving: all of Cambridge Village, Pershing Drive, Amber Lane, Winding Way, Valleybrook, Grenadier Lane, Riverview Road down to the Vaughn Road Bridge, and concrete replacement starting with Dunbar Lane in Bradford Village — plus 13,000 square feet of sidewalk work.

3 mentionsLast discussed Aug 18, 2026
LowRoads

Cut-through traffic on Riverview Road

Scott Warren's driveway gate is a response to drivers using his property as a GPS-suggested shortcut to Emerald Woods — sometimes at 2 a.m. The 6-foot gate tapers to 4 feet and required variances because it sits in the front yard.

1 mentionLast discussed Aug 10, 2026
HighRoads

Upcoming roadway and water main construction

Nearly every road will see work in the next couple of months: the Wallings Road bridge (targeting August 14), Mill Road one-way traffic, and water main work touching Brecksville and Sprague Roads. Closure lists go out via website, bulletin and email.

4 mentionsLast discussed Jul 21, 2026
MediumRoads

SR 82 Bridge Rehabilitation Over Chippewa Creek

ODOT will rehab the State Route 82 bridge near Heinen's — deck replacement slated for 2028, plus work to fix channel erosion and restore the falls with Metroparks. A public meeting is set for June 11 from 5 to 7 PM at city facilities.

1 mentionLast discussed Jun 2, 2026
MediumRoads

Downtown Construction Coordination

Three projects — Cleveland Water, the Ronyak repaving, and the Central School demolition — all converge near Arlington and Brecksville Road. The mayor and engineer want coordinated scheduling to keep downtown traffic sane.

1 mentionLast discussed Apr 21, 2026
MediumRoads

Safety of the accessible pedestrian route from Miller Road

The ADA walkway coming off Miller Road runs alongside a two-lane drive aisle where entering and exiting traffic stacks up. Commissioners asked the applicant to find a safer route, with the final design left to the City Engineer to approve.

1 mentionLast discussed Jan 22, 2026
MediumRoads

Miller Road Interchange property transfer

Land the city acquired for the Miller Road Interchange Project would be transferred to the State of Ohio under a proposed resolution.

1 mentionLast discussed Jan 20, 2026
HighRoads

Regional Transit Authority bus routes

RTA wants to run the 77 bus all the way to the southern city line instead of turning at Snowville Road, where about 18-19 riders a day already walk. It hinges on the new Allega Way intersection in Richfield opening, with an August 2026 start possible after a public hearing.

2 mentionsLast discussed Jan 20, 2026