Civic Issues
Topics getting the most attention in Green public meetings, ranked by how frequently they are discussed.
6 issues in water utilities
East Liberty Park water extension
The city is working with Aqua Ohio to extend water service into the park so restrooms and fountains can come off the well.
Sewer jet equipment replacement
The city's broken-down sewer jet — borrowed from New Franklin while repaired overseas — would be traded in for $50,000 toward a $324,672 replacement that can also dig with water jets, saving an estimated $60,000–$100,000 a year in contract cleaning.
Aqua Ohio water rates 2027–2031
A new five-year agreement with Aqua Ohio sets water rates and service charges for Green residents. A public hearing with an Aqua presentation was held at 7 p.m. the same evening.
Stormwater management on Byron Drive
Resident Zak Whitmire asked how grading and retention ponds will change the flow of water that currently drains toward his backyard. Staff said most stormwater will be directed southwest into three engineered basins, with details coming in final engineering.
Lumos fiber internet construction update coming March 24
Lumos Fiber is building fiber to every part of Green, targeting early fall completion, with a hotline (800-959-017) for construction complaints and a promise to restore yards. Council and the mayor pressed the company on utility strikes, open bore pits and missed seed-and-straw restoration.
Ohio Edison easement for underground power lines
Council granted Ohio Edison a 10-foot easement on city land so underground wiring can bring power to Cleckner Park, the city equipment storage facility, and the school bus garage. First-reading passage was requested to avoid delaying construction.