Civic Issues
Topics getting the most attention in Green public meetings, ranked by how frequently they are discussed.
15 issues in roads
Arlington Road construction disruptions
Paving is underway on Arlington Road, and the roundabout at Medler is done — the project should have Better/Medler open by Thanksgiving.
2026 Road Resurfacing and Pavement Markings
Arlington Road will be paved soon and Bettler Road should be finished by Thanksgiving, according to the city engineer's report.
Arlington Road Corridor Improvements
City Engineer Pickett told the Transportation Committee the Arlington Road corridor bid process kicks off next week, with construction to follow.
Deteriorated street signs and light poles in older developments
A resident showed the council a barely readable street sign at Briarwood and Maplewood and faded street-light poles, asking whether the city has any replacement protocol. Staff said there isn't a systematic program — call the service department and it gets replaced case by case.
Concrete contractor workmanship and road notification gaps
Council members flagged recurring complaints about the citywide concrete repair contractor — slurry runoff, dead grass — and a Mayfair Road microsurfacing backup with no geofenced notification to drivers.
Stoney Creek Estates Phase V street lighting district (Resolution 2026-R49)
The final 27 lots of the Stoney Creek subdivision are one step from approval. If Council signs off, Frontier Land Group plans to start construction this summer, bringing roughly 67 new homes total to the subdivision.
SR-619 and SR-241 resurfacing partnership
The ODOT resurfacing project got pushed to 2028 so the city can fund neighborhood paving next year. Neugebauer warned Massillon Road south of Koons is 'pretty bad' and urged the state not to wait, while the mayor pointed to badly-need neighborhood streets as the priority.
Meadow Wood traffic safety and speed humps
Speeding cars — many carrying high school students — are cutting through Meadow Wood, worsened by the Bott Road closure, with no sidewalks and kids waiting at bus stops. The mayor says speed humps bought during the Arlington Road project will be installed on a trial basis, with resident feedback to follow.
Neighborhood road paving prioritized for 2027
By pushing the state resurfacing project to 2028, the administration freed money to pave deteriorating neighborhood streets next year — a tradeoff some council members questioned but generally accepted.
Bettler Road closure
Bettler Road closes to eastbound traffic on August 31 for over a month, with westbound lanes remaining open. Detours have been posted.
Deteriorating roads in Watervale Drive / Serenity Lane neighborhood
Six residents say their subdivision roads — less than a mile serving 31 homes — are cracked, unsafe to walk, and neglected for years while development added heavy bus and truck traffic. Engineering says the damage extends to the road base, requiring a major fix rather than patching, and the neighborhood isn't on this year's paving list.
Arlington Ridge Road widening for Chick-fil-A turn lane
The city engineer reported tree clearing on Arlington Road ahead of the road widening project — expect visible activity there.
Wise Road/Mayfair Road intersection safety
Residents say the crest-hill intersection is among the most dangerous in the city, and Nancy Hagen now shops in Hartville rather than risk it. A roundabout lacks room; engineers are constrained by design standards.
Truck traffic and routing on Massillon Road
Byron Cullom wants better truck-route signage toward I-77 and a truck speed sign on Massillon Road between Greensburg and International Parkway, citing noise, speed and a crack in new pavement.
Graybill Road turn lane change orders
The turn lane project at Green Elementary ran about $58,600 over the original bid — mostly because two sewer manholes needed far more work than expected. Council has to sign off since the increase blew past the 10% limit.