Civic Issues
Topics getting the most attention in Green public meetings, ranked by how frequently they are discussed.
3 issues in water utilities with medium priority
Sewer jet equipment replacement
The city's broken-down sewer jet — borrowed from New Franklin while repaired overseas — would be traded in for $50,000 toward a $324,672 replacement that can also dig with water jets, saving an estimated $60,000–$100,000 a year in contract cleaning.
Stormwater management on Byron Drive
Resident Zak Whitmire asked how grading and retention ponds will change the flow of water that currently drains toward his backyard. Staff said most stormwater will be directed southwest into three engineered basins, with details coming in final engineering.
Ohio Edison easement for underground power lines
Council granted Ohio Edison a 10-foot easement on city land so underground wiring can bring power to Cleckner Park, the city equipment storage facility, and the school bus garage. First-reading passage was requested to avoid delaying construction.