11 issues with high priority
Comprehensive Plan and zoning code updates
The city previewed new form-based zoning districts for downtown Hilliard, the Cemetery Road/Leap Road gateway, and a future Heritage Trail extension — allowing missing-middle housing, ADUs, and taller buildings near Main Street, with an affordability height bonus. Residents can weigh in through December.
Alton Place HCD subarea C7 modification
The developer wanted to swap planned brownstones and patio homes for more single-family lots, but the commission balked twice, worried the development is drifting from its promised mixed-use character. Residents echoed concerns about unfinished work, slow commercial buildout, and traffic.
2027 Capital Improvement Budget
Council gave final approval to next year's capital budget — the big-ticket items include $6.2 million for street repaving, $1.75 million for sidewalks, $4.8 million for the Heritage Trail Extension, and major water and sewer work.
Yetsi property rezoning and Tarleton Meadows traffic
A proposed 69-home subdivision next to Tarleton Meadows would send an estimated 820 extra car trips a day through neighborhood streets that already have speeding problems, with no new Hayden Run Road entrance. Residents want the entrance restored and a safe Heritage Trail crossing, and the December 14 vote is the decision point.
Old Hilliard Sanitary Sewer Evaluation Study
Council approved a $130,000 portable sewer camera system so crews can find pipe problems before they become expensive backups — replacing a 10-year-old unit prone to breakdowns.
2027 Community Grants Program distribution
Council decides each year how to split $200,000 among local nonprofits. This year it gave out $166,000, favoring long-standing Hilliard institutions and food security, and declined requests that would pay individual salaries or fund service clubs, churches, and media.
Circle K gas station at Roberts and Alton Darby
Council had to decide whether to fold a corner parcel into the Alton Place C-7 sub-area, effectively moving the planned Circle K from the southwest corner of Roberts/Alton Darby to the northeast corner — closer to apartments and townhomes but farther from the Hamilton Ditch stream restoration and better for right-in/right-out traffic. Text changes staff opposed were denied.
Pedestrian/bicycle mobility and safety program
A $300,000 consultant contract keeps sidewalk, crosswalk, and trail projects moving, starting with closing the Hayden Run Greenway Trail gap between Eventing Way and Avery Road.
Hampton Reserve Ditch Maintenance
Routine stormwater inspection found the city responsible for downstream ditch work near Hampton Reserve; the Franklin County Engineer will do it for up to $101,833.
Road, culvert, and intersection projects
The city has never systematically inspected culverts smaller than 10 feet, and some could pose real risks. A new $150,000 contract will inventory, map, and assess them so problems get fixed before roads fail.
Heritage Trail Extension land acquisition
The city is chasing state grants to help fund a roughly $600,000 trail connector between Municipal Park and the Hilliard Wellness Campus.