Civic Issues
Topics getting the most attention in Hudson public meetings, ranked by how frequently they are discussed.
22 issues in roads
No right turn on red at SR 303 and Hayden Parkway
A school-safety measure got postponed to November 10 so Council can weigh limiting it to school hours versus keeping it in effect year-round.
Mid-block crosswalk on North Main Street
Removing the mid-block crosswalk with its flashing beacon could improve traffic flow and free up about three parking spots — which could offset spots lost to the Hudson's patio expansion. Discussion is scheduled for early 2027.
Sidewalk connectivity versus roads and stormwater
Council wrestled with how little sidewalk connectivity money is left in the five-year plan after major projects wrapped up. One idea: shift some road program funding to build the Barlow Road sidewalk, accepting a small dip in pavement ratings.
Public works excess soils and Barlow Road sidewalk
Two consent items affect infrastructure: a change order for unexpected excess soils at the public works site (insurance may reimburse ~$1.7 million), and a design contract for the Barlow Road sidewalk connecting Nicholson Drive to the hike-and-bike trail.
Safe Routes to School sidewalk grant
The HOME Committee is tackling late school buses and e-bike/e-scooter safety concerns, with a joint meeting of schools, parks, police, and the mayor planned, plus a student forum.
W. Barlow Road railroad crossing exemption
Council agreed to seek a PUCO exemption for the long-dormant West Barlow Road crossing so school buses no longer have to stop. It's a stopgap until the rails-to-trails conversion removes the tracks entirely.
2027 Capital Maintenance Program
Council finalized over $55 million in borrowing for major projects: the Public Works facility (up $2 million due to a contractor error), salt and bus facilities, Velocity Broadband residential internet, the Fire/EMS renovation, and smart water/power meters.
Bridge Project Updates (Prospect Street and Route 91)
Two bridges west of the fire station get repaired and one east of Barlow Community Center gets replaced.
Truck traffic on SR 91 and SR 303
Staff looked into restricting trucks on these routes after a resident request and concluded the city legally can't limit by truck size, and a weight limit would be impractical to enforce. They recommended against it; the turn-radius widening question was also revisited and again set aside.
Walk and Bike Plan Sidewalk Ranking Methodology
The sidewalk ranking system may get a refresh, with safety and number of residents served considered as explicit scoring factors. Residents near the bottom of the 17-segment, $29 million list wait roughly seven years under current funding.
Boston Mills Road resurfacing
Council approved a federal-aid agreement with ODOT to resurface Boston Mills Road from State Route 303 to the west corporation limit.
State Route 303 Speed Limit Request
Resident Robert Papes asked council to lower the SR 303 speed limit to 35 mph to the Boston Heights line, saying drivers routinely exceed the posted limit. Council Member Brezovec explained ODOT requires a speed study; the city manager will revisit one that was done years ago.
Hines Hill Road Grade Separation Funding
The Ohio Rail Development Commission raised its grant for the Hines Hill Road grade separation from about $2.89 million to $4.29 million.
Senior transportation program and donated van
Local foundations raised enough to buy a roughly $58,000 passenger van so Hudson residents 65 and older can get rides. The city would accept the donation and run the program — first reading passed, final vote later.
Downtown pedestrian safety improvements funding increase
Council added $127,884 to the Downtown Pedestrian Phase 2 project, funding curb ramps, new sidewalk on South Main Street between Bard and Stoney Hill, and upgraded pedestrian signals along SR 91 and SR 303.
Stow Road underpass closure and downtown drainage work
ODOT will close the Stow Road underpass at I-480 for about eight months starting the week of March 16, which could cause delays on State Route 91. Public Works will also fix a chronically wet spot at Church and East Main.
Engineering standards update
The city's infrastructure construction standards haven't been updated since 2019; Ordinance 26-21 brings plan submission rules in line with current industry practice.
Adaptive traffic signal performance on Routes 91 and 303
The new smart signal system is working: cars hit green lights 75% of the time versus 45% before, and average delays dropped to about five seconds per vehicle. Council wants a simple public-facing summary of the progress posted on the city website.
Downtown pedestrian safety funding boost
A proposed $127,884.34 funding increase for Phase 2 of the downtown pedestrian project — new curb ramps, sidewalk on S. Main Street, and upgraded pedestrian signals along SR 91 and SR 303.
Seasons Road resurfacing with Stow
Hudson and Stow will split the cost of resurfacing Seasons Road from Hudson Drive to the west corporation line, with Hudson paying no more than $250,000.
Franklin Street sidewalk and waterline
A new 5-foot sidewalk on Franklin Street will give middle school students a safer walking route without crossing the busy Franklin/Aurora intersection, with the schools kicking in $28,000. The waterline between Aurora Street and the Middle School gets replaced too.
HAWK signal not moving forward
After Dr. Goetz talked with the resident who would have benefited, the city decided not to proceed with the HAWK pedestrian signal.