Civic Issues
Topics getting the most attention in Perrysburg public meetings, ranked by how frequently they are discussed.
23 issues in roads
ODOT grants for Louisiana Avenue resurfacing and shared-use paths
Louisiana Avenue gets repaved from Indiana Avenue to the Co rk line, with most of the cost covered by an ODOT grant. Expect smoother driving by next spring or summer.
Eckel Road Vacation
A forgotten stub of city right-of-way on Eckel Road has actually been the Michels property's gated entrance for years. The city agreed to give it up since it has no other use.
SR 25 and Eckel Junction intersection improvement
The city will pay $6,900 extra to have Mannik & Smith evaluate an idea to improve the rough SR 25/Eckel Junction intersection as part of the corridor study update.
Pedestrian Safety at I-75 Overpass (Route 20)
A resident asked about safer walking and biking across the SR 199 bridge over I-75, where there's little room. Officials will look at signage options, remember a widened berm on the east side, and ask the city's grant coordinator to pursue funding — though major fixes likely wait years for a grant or an ODOT bridge replacement.
Front Street speed limit fix
During the Front Street corridor study, staff discovered the posted 35 mph speed limit was never officially journalized with the state — the legal speed is 45 or 50. Council is asking ODOT to formally establish 35 mph limits on two Front Street stretches.
State Route 25 corridor study
A resident urged council to consider the bird habitat — vernal pools and shore birds — on farmland at Five Point Road and Route 25 before any development there.
Fort Meigs Road Multi-Use Path
The city's clearing of the drainage ditch behind 31 homes — part of the Fort Meigs Road multi-use path project — removed heavy vegetation that screened backyards. Homeowner Troy Clayton wanted a 6-foot fence in response but was denied; the board suggested split rail plus plantings and invited a new application once city landscaping is complete.
Garmin marathon traffic impacts
The Garmin Run comes through town Sunday, September 20 — expect Front Street and bridge traffic delays until about noon; churches along the route were notified in advance.
East Indiana Avenue resurfacing grant application
The city wants to apply for an 80% federal grant to mill and resurface E. Indiana Ave from Louisiana to E. Boundary. Money wouldn't arrive until 2030 or later, and the local share would be about $157,000. The project may also consider lane changes to ease school-traffic backups.
Transit Services Extension
The RideRights (MTM) transit service contract will be extended a year through September 2027, with a planned 5% increase and continued positive rider feedback.
Finley Road resurfacing grant
The city wants state OPWC money to repave Finley Road between Mulberry and Indiana, which is getting rough despite a 2014 repaving — possibly from settling sewer-separation trenches. Staff pursues the more competitive roads-only funding pot to maximize Wood County's scoring chances.
Front Street corridor roundabouts
A comprehensive safety study of the 1.4-mile Front Street corridor recommends roundabouts at both boundary intersections, safer pedestrian crossings, and a multi-use path. Residents concerned about speeding and cut-through traffic get to weigh in at a July 20 open house before any decisions are made.
Front Street project public comment
The Front Street project's QR-code comment portal stays open until after the August 4 Council meeting — about 25 comments so far.
Downtown construction update
Phase two of the downtown rebuild starts this month on the 100 and 200 blocks of Louisiana Avenue and will take about eight months. Shops stay open and at least half the parking remains, and the Farmers Market will flip sides of the street as construction flips. Traffic lights at Louisiana/Front Street may come down, with a temporary three-way stop planned for pedestrian crossings to Hood and Riverside Parks.
Downtown Construction Phase Change
Construction starts this month downtown, but all shops stay open and the Farmers Market remains, flipping to whichever side of the street isn't torn up.
Construction inspection staffing for 2026 projects
With the downtown project and Fort Meigs Ditch both consuming full-time inspection staff, the city is hiring American Structure Point to inspect the new West Boundary multi-use path build on SR 25.
2026 Street Resurfacing and Road Program
Crestline Paving will repave residential streets across the city for about $1.81 million. The bid came in over budget, but the city covers it by postponing the Indiana Avenue resurfacing to 2027 — so no tax increase or budget amendment is needed.
US 20/SR 705 interchange and welcome sign replacement
ODOT's roundabout project at Sandusky and E. South Boundary will replace the wooden welcome sign; the city will form a design committee rather than rush. ODOT will also repave short city-owned road sections at no cost to Perrysburg.
2026-2027 Infrastructure Projects
A slate of road, watermain, signal, and multi-use path projects is coming, including resurfacing 12 streets, Indiana Avenue reconstruction, and downtown streetscape Phase Two.
Route 23 bypass advocacy
The regional council has pushed since the 1990s for a free-flowing bypass between Route 23 and I-71 — currently that stretch has 38 traffic lights. Phase one engineering and a selected route near Ashley are expected by October.
MPO transportation funding and penalty structure
The regional council manages roughly $17-18 million a year in federal transportation funds Perrysburg can tap for roads, roundabouts, and bike projects. New penalty rules dock points from future applications if your projects slip or get canceled, and ODOT is watching delivery performance more closely than ever. Timing matters too: submitting projects in the first two quarters of the state fiscal year (July–December) could earn a reduced local match.
Ft. Meigs Road and Coe Court Traffic Signal
A new signal at Ft. Meigs Road and Coe Court, where Hawthorn Subdivision traffic has grown sharply. The developer reimburses up to half the $322,452 cost, softening the hit to city coffers.
Fort Meigs/Eckel Road turning lane markings
A resident flagged that the lane heading from Eckel toward Fort Meigs near Fort Meigs Elementary is wide enough that drivers informally use the shoulder to turn right on red, creating an unmarked two-lane setup. He asked the city to consider painting marked turning lanes.