JLA

Jeffrey L. Anzevino

Mayor2022-04-12–2027-12-07 (continuous in the Mayor office since 2022-04-12 per Legistar Web API office record for the City of Hudson [read]; current term from December 2023 election; Charter Sec. 3.01 and 4.01 [read in Ordinance 25-111 text]: four-year terms commencing at the first regular Council meeting after the Board of Elections certification in December)

No biography on file yet.

At a glance

News mentions
1

Term ending Dec 7, 2027.

Voice

Meetings spoken in
38
Total speaking time
11:32:58
Avg per meeting
18:14
Segments
10607

Want every word Anzevino has said?

The OpenCity MCP for Claude.ai answers questions like “what has Anzevino said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Top issues during term (20)

critical↓Aug 2026[61]

Canterbury Meadows settlement and 32-lot subdivision

The settlement resolves a developer hardship claim whose real financial risk to the city wasn't detailed publicly.

high↑Feb 2026[54]

Short-Term Rental Regulations

Fee stays at $100, which doesn't cover the city's cost to administer the program.

critical↑Mar 2026[43]

Clinton Crossing concept site plan

Traffic and infrastructure studies are still forthcoming.

medium↑Oct 2026[38]

Planning Commission–City Council tensions over attendance and oversight

high↓Jul 2026[37]

Low-speed vehicle rules (Chapter 478)

Unknown — enforcement and inspection costs not yet quantified.

medium↑Oct 2026[33]

No right turn on red at SR 303 and Hayden Parkway

Minimal — sign installation and enforcement only.

high→Jan 2026[28]

Land Development Code Updates — Market Hall and Planned Developments

A citywide traffic study would need budget consideration in 2027.

high→Apr 2026[27]

Clinton Crossing downtown redevelopment financing

The city still owes about $11 million on the land, and the site is targeted to open in 2029 or 2030 with future tax and revenue benefits.

high→Sep 2026[25]

New Public Works facility financing

Up to $1.72 million, expected to be reimbursed by insurance.

high→Sep 2026[25]

Bond package for capital projects (~$52 million)

About $54.5 million in notes and bonds, largely revenue-backed; the public works piece rose $2 million from a contractor error.

high↓Jun 2026[23]

Engineering standards for fiber/drilling construction

Estimated up to a 20% cost increase on affected projects, including the Velocity Broadband rollout.

high↓Jan 2026[22]

Velocity Broadband residential expansion

Year-two construction will be awarded to the lowest and best bidder; the Calix contract amount was not stated.

high↑Sep 2026[18]

Standard Shop Company industrial park approval expiration

A performance bond remains in place, and the city is requiring stronger bank financing documentation.

medium↑Jun 2026[17]

City finances: income tax up, HCTV and ambulance fees down

Fire personnel costs rose roughly $1 million with only a $600,000 subsidy; a new ambulance in 2031 would nearly halve the EMS fund balance.

critical↑Jan 2026[16]

Five-Year Plan 2027-2031

General fund balance is projected to dip below the 40% reserve target in out years; a $2.6 million Barlow sidewalk project and a $500k+ annual general fund subsidy to the fire fund are in the mix.

medium↑Sep 2026[15]

Salt barn relocation and bus garage

The move costs well under $1 million total (roughly $600,000 plus self-performed work), a fraction of the $4.3 million Coberna barn.

high↑Oct 2026[15]

Hudson's Restaurant sidewalk patio and downtown parking

Losing a few downtown parking spots; no direct city cost yet, though further engineering study is coming.

medium↑Oct 2026[15]

Summit Metro Parks Maple Grove lease termination

The city buys the land back below the county's original asking price; cost not stated.

critical↑Sep 2026[15]

Prestige Agreement

A rejected appeal fight could cost the city in litigation, but commissioners argued the city is likely to win and that liability coverage may apply.

critical↓Jan 2026[15]

District 11 zoning on South Darrow Road

Supporters argue the rezoning could restore income tax revenue lost when JoAnn's closed, funding services like parks and roads.

Decisions during term (402)

Recorded while Anzevino was in office — not necessarily decisions they moved, spoke to, or voted on.

approved6-0-1Nov 10, 2026

Approval of October 20, 2026 Council Meeting Minutes

approved6-0-1Nov 10, 2026

Approval of October 27, 2026 Council Workshop Minutes

approved7-0Nov 10, 2026

Consent Agenda (Items 10.A–10.D)

tabled6-1Nov 10, 2026

Table Ordinance 26-78 (Short-Term Rental Operations)

approved7-0Nov 10, 2026

Executive Session — Pending Litigation (Topic A)

approved5-0-2Nov 10, 2026

Executive Session — Pending Litigation (Topic B)

tabledNov 10, 2026

Postponement of Canterbury Meadows Settlement (Resolution 26-118)

approved7-0Nov 10, 2026

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER WITH DUNLOP AND JOHNSTON IN AN AMOUNT NOT TO EXCEED $1,718,994.41 FOR ADDITIONAL GRADING (EARTHWORK), SOIL RELOCATION, AND RELATED COSTS AT THE PUBLIC WORKS FACILITY…

approved7-0Nov 10, 2026

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE OPTION AND LEASE AGREEMENT WITH NORTHSTAR TOWERS II, LLC TO INCREASE THE NUMBER OF EXTENDED TERMS FOR THE COMMUNICATIONS TOWER SITE AND TO DO ALL THINGS NECESSARY TO…

approved7-0Nov 9, 2026

Approval of October 19, 2026 meeting minutes

tabled7-0Nov 9, 2026

Clinton Crossing concept site plan (PC 2026-1397) continued to December

tabled7-0Nov 9, 2026

Salt barn major site plan (PC 2026-1402) continued to December for relocation study

approved7-0Nov 9, 2026

Recommendation to repeal Chapter 1210 (Beneficial Use Determination)

approved6-0-1Nov 9, 2026

Adoption of 2027 Planning Commission meeting schedule

approvedOct 28, 2026

Consent agenda: 190 N Main Street signs and 29 Baldwin Street shingle replacement

approvedOct 28, 2026

1662 Goshen Drive detached garage (AHBR 26-1355)

tabledOct 28, 2026

1556 W. Prospect Street new house (AHBR 26-1410)

tabledOct 28, 2026

84 N Oviatt Street door replacement (AHBR 26-1408)

approvedOct 28, 2026

105 First Street wall and projecting signs (AHBR 26-1412)

tabledOct 28, 2026

190 N Main Street roof replacement (AHBR 26-1419)