HighWater Utilities

Water and Sewer Rate Increases

Your water and sewer bills would rise 2% a year for five years — about $1.17 more per month for a minimum-use household next year. The money funds EPA-mandated water main replacements, lead service line work, and a sewer overhaul projected near $100 million over 20 years.

4 mentions (2 this month)Last discussed Nov 3, 2026
HighWater Utilities

New water and sewer rates

Council passed ordinances setting new sanitary sewer and water rates — utility bills will change for residents and businesses.

2 mentions (1 this month)Last discussed Nov 3, 2026
HighWater Utilities

Sanitary Sewer Credits

A homeowner spent nearly $2,000 excavating his yard after city technicians said a leak was on his side of the supply valve — but no leak was ever found. The city declined reimbursement, citing consistent treatment of all such cases, and the committee agreed to monitor the site and revisit the issue.

3 mentions (2 this month)Last discussed Nov 3, 2026
HighWater Utilities

Wastewater plant digester project on track

A digester membrane at the wastewater plant failed catastrophically Friday afternoon, releasing methane. Staff worked around the clock through Tuesday with fire department and vendor support to contain it — a reminder of what keeps your water bills and services running.

2 mentions (1 this month)Last discussed Oct 20, 2026
HighWater Utilities

Front, Second and Third Street watermain improvements

Council reauthorized the state revolving loan agreement for the watermain replacement so the project can proceed.

2 mentionsLast discussed Oct 6, 2026
HighWater Utilities

Watermain replacement on Front, Second, Third and Indiana

The city is replacing waterlines on several near-downtown streets using directional drilling where possible to save trees, sidewalks, and driveways. The low bid came in under the $3.5M budget.

3 mentionsLast discussed Oct 6, 2026
HighWater Utilities

Stormwater Fee Start-Up

Council finalized new stormwater management rules, set the utility base rate, and started a $1,500-per-acre pollution prevention deposit fund for construction sites.

3 mentionsLast discussed Sep 28, 2026
HighWater Utilities

Water main replacement on Front, Second, Third Streets

About 10,400 feet of water main in the northwest part of the city gets replaced this fall using directional drilling. An open house is planned so homeowners can get one-on-one answers before construction starts.

3 mentionsLast discussed Sep 1, 2026
HighWater Utilities

Ft. Meigs Ditch Repair and Multi-Use Path

An open house on January 21 showcased drawings and engineers for the multi-use path along the Fort Meigs Ditch — a chance for residents to weigh in before construction planning advances.

4 mentionsLast discussed Jul 21, 2026
HighWater Utilities

SSO Elimination Plan and Ohio EPA DFFO Compliance

Perrysburg's membership in the regional Stormwater Coalition helps the city meet federal MS4 stormwater permit education requirements — that's the source of those 'pick up after your dog' commercials under the 'Lake Erie Starts Here' campaign.

4 mentionsLast discussed Jul 7, 2026
HighWater Utilities

Reservoir pressure valve replacement

Two 60-plus-year-old valves that keep water pressure right at the city's reservoirs are failing — one is already dead. Council will decide on replacements to protect the water distribution system.

1 mentionLast discussed Apr 27, 2026
HighWater Utilities

Natural gas aggregation extension with Archer Energy

The Archer Energy contract for residents and small businesses is extended for 23 months at a lower rate than previously discussed — approved as an emergency.

2 mentionsLast discussed Mar 3, 2026